{"id":12422,"date":"2025-01-17T09:50:00","date_gmt":"2025-01-17T08:50:00","guid":{"rendered":"https:\/\/www.mezzoteam.fr\/?p=12422"},"modified":"2025-01-20T10:21:51","modified_gmt":"2025-01-20T09:21:51","slug":"understanding-the-challenges-of-bcf-in-bim-management","status":"publish","type":"post","link":"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/","title":{"rendered":"Understanding the challenges of BCF in BIM management"},"content":{"rendered":"\n<p>BIM (Building Information Modeling) has revolutionised project management in the construction sector, offering an integrated and collaborative approach to the design, construction and management of buildings. At the heart of this methodology is the BCF (BIM Collaboration Format), an essential tool for improving coordination and collaboration between the various stakeholders involved in a BIM project. Let&#8217;s explore together the role of BCF in the BIM workflow, its benefits and the best practices for its effective implementation.<\/p>\n\n\n\n<p><strong style=\"color: #005378;\">1. Definition and role of the BCF in the BIM workflow<\/strong><\/p>\n\n\n\n<div class=\"wp-block-media-text alignwide is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img decoding=\"async\" width=\"800\" height=\"605\" src=\"https:\/\/www.mezzoteam.fr\/app\/uploads\/2025\/01\/ordi_format-bcf-1.png\" alt=\"\" class=\"wp-image-12853 size-full\" srcset=\"https:\/\/www.mezzoteam.fr\/app\/uploads\/2025\/01\/ordi_format-bcf-1.png 800w, https:\/\/www.mezzoteam.fr\/app\/uploads\/2025\/01\/ordi_format-bcf-1-300x227.png 300w, https:\/\/www.mezzoteam.fr\/app\/uploads\/2025\/01\/ordi_format-bcf-1-768x581.png 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p><strong style=\"color: #00EBD2;\">What is BCF ?<\/strong><\/p>\n\n\n\n<p><p>BCF, or BIM Collaboration Format, is an open file format designed to facilitate communication and collaboration between members of a BIM project team. Unlike traditional BIM model files, which contain geometric and non-geometric data, BCF files are lightweight containers that store information about problems or changes required in BIM models, without including the voluminous data of the model itself.<\/p> <\/p>\n<\/div><\/div>\n\n\n\n<p>A typical BCF file may contain comments, screenshots, camera coordinates, instructions and other metadata relevant to identifying and resolving specific issues.<\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">The role of the BCF in the BIM workflow<\/strong><\/p>\n\n\n\n<p>The BCF plays a crucial role in the BIM workflow by facilitating fluid communication between the various project stakeholders. It enables architects, engineers and others involved in a construction project to report, track and resolve design and construction issues in a coordinated and transparent way. By centralising the exchange of information on specific problems, the BCF helps to avoid misunderstandings, reduce errors and improve the overall efficiency of the project.&nbsp;<\/p>\n\n\n\n<p><strong style=\"color: #005378;\">2. Benefits of the BCF for coordination and collaboration<\/strong><\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Improved communication<\/strong><\/p>\n\n\n\n<p>One of the main benefits of BCF BIM is the significant improvement in communication between the various parties involved in the project. Thanks to BCF, professionals can exchange precise and relevant information on problems encountered, accompanied by screenshots and detailed comments. This enables each member of the team to clearly understand the context and nature of the problem, facilitating faster and more effective resolution.<\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Centralised information<\/strong><\/p>\n\n\n\n<p>The BCF centralises all information relating to design and construction issues in a standardised and accessible format. This centralisation allows project teams to track the history of modifications and discussions, ensuring that all stakeholders have the same information at all times. This reduces the risk of duplication, conflicting information and miscommunication.<\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Reduced errors and costs<\/strong><\/p>\n\n\n\n<p>By providing a clear and structured platform for reporting and tracking issues, the BCF helps to reduce costly errors and delays in construction projects. Problems can be identified and resolved more quickly, minimising work interruptions and last-minute revisions. This increased efficiency means lower overall project costs and better use of resources.<\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Facilitating interdisciplinary collaboration<\/strong><\/p>\n\n\n\n<p>BCF BIM also facilitates interdisciplinary collaboration by enabling the different trades to work together more coherently and harmoniously. Architects, engineers, builders, etc. can share and comment on problems in a transparent way, encouraging a collaborative approach to solving project challenges. This synergy between disciplines improves the overall quality of the project and encourages innovation.&nbsp;<\/p>\n\n\n\n<p><strong style=\"color: #005378;\">3. Best practices for the effective implementation of BCF in BIM projects<\/strong><\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Standardisation of processes<\/strong><\/p>\n\n\n\n<p>To take full advantage of BCF, it is essential to standardise the problem management processes within the project team. This includes:&nbsp; <\/p>\n\n\n\n<ul style=\"color: #7e8890;\">\n<li>Clearly defining roles and responsibilities;&nbsp;<\/li>\n<li>Standardised procedures for reporting and tracking issues;<\/li>\n<li>The use of consistent BCF file formats.&nbsp;<\/li>\n<\/ul>\n\n\n\n<p>Standardisation ensures that all team members understand and follow the same protocols, which improves the efficiency and consistency of problem management.&nbsp;<\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Training and awareness<\/strong><\/p>\n\n\n\n<p>Successful implementation of BCF requires adequate training and awareness-raising among project team members. It is crucial to train users on the use of BCF tools, best practices for reporting and tracking issues, and the importance of maintaining clear and accurate communications. Raising awareness of the importance of BCF in the BIM workflow helps to ensure that all team members adopt and use this technology effectively.<\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Integration with existing BIM tools<\/strong><\/p>\n\n\n\n<p>To maximise the effectiveness of BCF, it is important to integrate it seamlessly with the existing BIM tools used in the project. Most modern BIM software supports the BCF format, allowing easy import and export of BCF files. By integrating BCF with modelling, coordination and project management tools, teams can ensure that issues are managed smoothly and consistently throughout the project lifecycle.<\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Problem monitoring and review<\/strong><\/p>\n\n\n\n<p>Effective problem management requires ongoing monitoring and review of BCF files. Teams should put in place regular procedures to review reported issues, check progress in resolving them and update BCF files accordingly. This ensures that all information remains up to date and that issues are resolved proactively.<\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Use of collaborative platforms<\/strong><\/p>\n\n\n\n<p>The use of collaborative platforms compatible with the BCF, such as a CDE, can greatly improve the efficiency of problem management. These platforms allow all stakeholders to view, comment on and track issues in real time, facilitating seamless and effective collaboration. By centralizing all communications and issue data on a single platform, teams can avoid information silos and improve overall project coordination.<\/p>\n\n\n\n<p><strong style=\"color: #005378;\">4. The role of CDEs in the BIM workflow: a closer look at the use of the BCF<\/strong><\/p>\n\n\n\n<div class=\"wp-block-media-text alignwide is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img decoding=\"async\" width=\"1024\" height=\"774\" src=\"https:\/\/www.mezzoteam.fr\/app\/uploads\/2018\/07\/ordi_mezzo-5.6-1024x774.png\" alt=\"\" class=\"wp-image-9059 size-full\" srcset=\"https:\/\/www.mezzoteam.fr\/app\/uploads\/2018\/07\/ordi_mezzo-5.6-1024x774.png 1024w, https:\/\/www.mezzoteam.fr\/app\/uploads\/2018\/07\/ordi_mezzo-5.6-300x227.png 300w, https:\/\/www.mezzoteam.fr\/app\/uploads\/2018\/07\/ordi_mezzo-5.6-768x581.png 768w, https:\/\/www.mezzoteam.fr\/app\/uploads\/2018\/07\/ordi_mezzo-5.6.png 1500w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p><strong style=\"color: #00EBD2;\">What is a CDE?<\/strong><\/p>\n\n\n\n<p> A CDE, or Common Data Environment, is a centralised platform where all the information relating to a construction project is stored, organised and shared between the various stakeholders. It is designed to ensure that all members of the project team work with the same data and have consistent access to critical project information. CDEs enable integrated management of documents, models and data, and are equipped with advanced collaboration features. CDEs and the BCF BIM are closely linked in the BIM workflow.<\/p>\n<\/div><\/div>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Centralising data and problems<\/strong><\/p>\n\n\n\n<p>One of the main roles of CDEs is to centralise all project information. When a problem is identified in the BIM model, the BCF file can be imported into the CDE. This allows teams to centralise not only the BIM models, but also the issues, discussions and associated resolutions. Thanks to this centralisation, all stakeholders can view current issues, proposed resolutions and updates in real time. For example, when an engineer detects a design conflict in the model, he or she can create a BCF file with details of the problem and share it via the CDE, where other team members can add their comments and solutions.<\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Facilitating multidisciplinary collaboration<\/strong><\/p>\n\n\n\n<p>CDEs provide tools for managing interactions between different disciplines involved in a BIM project.<\/p>\n\n\n\n<p>By integrating BCF files into the CDE, it is possible to create a collaborative space where architects, engineers, BIM managers and other stakeholders can review and discuss reported issues. Comments and responses are centralised, making it easier to resolve issues and ensuring that all parties involved are aware of developments. For example, an architect can report a coordination problem between the structural and MEP (Mechanical, Electrical, Plumbing) systems via a BCF, and the engineers can respond directly in the CDE.<\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Version management and change history<\/strong><\/p>\n\n\n\n<p>CDEs enable versions of BIM models and BCF files to be tracked, which is crucial for effective problem management.<\/p>\n\n\n\n<p>Each version of the model can be associated with specific BCF files, making it possible to track issues over time and identify how resolutions have evolved. For example, if a problem is reported in one version of the model and resolved in a later version, the CDE can keep a history of problems and solutions, enabling teams to go back to earlier versions if necessary.<\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Data quality assurance <\/strong><\/p>\n\n\n\n<p>A well-designed CDE incorporates mechanisms to ensure data quality. As far as the BCF is concerned, this includes tools to check that BCF files are correctly formatted, that information is complete and that problems are properly documented. The CDE&#8217;s validation features can help avoid communication errors and maintain data quality throughout the project.<\/p>\n\n\n\n<p><strong style=\"color: #00EBD2;\">Tracking actions and resolutions<\/strong><\/p>\n\n\n\n<p>CDEs can also be used to track the actions taken in response to problems reported in BCF files. The task and workflow management features in the CDE can be used to assign tasks to team members, track their progress and check that the necessary actions are complete. For example, when an issue is flagged in a BCF, a project manager can create a task in the CDE for an engineer to resolve, and track the progress of that task until it is resolved.<\/p>\n\n\n\n<div style=\"height:31px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong style=\"color: #005378;\">BCF BIM is a powerful tool that is transforming the way project teams manage coordination and collaboration in construction projects. By facilitating the clear and structured communication of issues, BCF improves efficiency, reduces errors and costs, and promotes harmonious interdisciplinary collaboration. To maximise the benefits of BCF, it is essential to follow good practice in standardisation, training, integration and monitoring. By adopting a proactive and structured approach to the use of BCF, construction professionals can optimise their BIM processes and ensure the success of their projects.<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong style=\"color: #005378;\"><em>About Mezzoteam<\/em><\/strong><\/p>\n\n\n\n<p>Mezzoteam is a Common Data Environment (CDE) that enables thousands of stakeholders in the construction industry to manage their models, documents and validation processes in complete security. Used from the design phase through to operation, the collaborative BIM platform is available in Cloud or On-premises, depending on project requirements.<\/p>\n\n\n\n<p><a href=\"https:\/\/webikeo.fr\/chaine\/mezzoteam\">Subscribe to our webinar channel<\/a><br><a href=\"https:\/\/www.mezzoteam.fr\/en\/contact-us-ask-for-a-demo\/\">Need a personalised demo? Contact us now!<\/a><\/p>\n\n\n\n<p><strong style=\"color: #005378;\">&nbsp;<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BIM (Building Information Modeling) has revolutionised project management in the construction sector, offering an integrated and collaborative approach to the design, construction and management of buildings. At the heart of this methodology is the BCF (BIM Collaboration Format), an essential tool for improving coordination and collaboration between the various stakeholders involved in a BIM project. [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":11189,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[],"class_list":["post-12422","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solution-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Understanding the challenges of BCF in BIM management<\/title>\n<meta name=\"description\" content=\"Discover the crucial role of the BCF in improving coordination and collaboration in BIM projects, best practices and key benefits.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Understanding the challenges of BCF in BIM management\" \/>\n<meta property=\"og:description\" content=\"Discover the crucial role of the BCF in improving coordination and collaboration in BIM projects, best practices and key benefits.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/\" \/>\n<meta property=\"og:site_name\" content=\"Mezzoteam\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-17T08:50:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-20T09:21:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mezzoteam.fr\/app\/uploads\/2024\/02\/SITEWEB_actu2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1262\" \/>\n\t<meta property=\"og:image:height\" content=\"450\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Sophie S\u00e9nant\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sophie S\u00e9nant\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/\",\"url\":\"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/\",\"name\":\"Understanding the challenges of BCF in BIM management\",\"isPartOf\":{\"@id\":\"https:\/\/www.mezzoteam.fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.mezzoteam.fr\/app\/uploads\/2024\/02\/SITEWEB_actu2.jpg\",\"datePublished\":\"2025-01-17T08:50:00+00:00\",\"dateModified\":\"2025-01-20T09:21:51+00:00\",\"author\":{\"@id\":\"https:\/\/www.mezzoteam.fr\/#\/schema\/person\/694c66b08f103f35234bca0ff514422a\"},\"description\":\"Discover the crucial role of the BCF in improving coordination and collaboration in BIM projects, best practices and key benefits.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/#primaryimage\",\"url\":\"https:\/\/www.mezzoteam.fr\/app\/uploads\/2024\/02\/SITEWEB_actu2.jpg\",\"contentUrl\":\"https:\/\/www.mezzoteam.fr\/app\/uploads\/2024\/02\/SITEWEB_actu2.jpg\",\"width\":1262,\"height\":450},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.mezzoteam.fr\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Understanding the challenges of BCF in BIM management\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.mezzoteam.fr\/#website\",\"url\":\"https:\/\/www.mezzoteam.fr\/\",\"name\":\"Mezzoteam\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.mezzoteam.fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.mezzoteam.fr\/#\/schema\/person\/694c66b08f103f35234bca0ff514422a\",\"name\":\"Sophie S\u00e9nant\",\"url\":\"https:\/\/www.mezzoteam.fr\/en\/author\/sophie\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Understanding the challenges of BCF in BIM management","description":"Discover the crucial role of the BCF in improving coordination and collaboration in BIM projects, best practices and key benefits.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/","og_locale":"en_US","og_type":"article","og_title":"Understanding the challenges of BCF in BIM management","og_description":"Discover the crucial role of the BCF in improving coordination and collaboration in BIM projects, best practices and key benefits.","og_url":"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/","og_site_name":"Mezzoteam","article_published_time":"2025-01-17T08:50:00+00:00","article_modified_time":"2025-01-20T09:21:51+00:00","og_image":[{"width":1262,"height":450,"url":"https:\/\/www.mezzoteam.fr\/app\/uploads\/2024\/02\/SITEWEB_actu2.jpg","type":"image\/jpeg"}],"author":"Sophie S\u00e9nant","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Sophie S\u00e9nant","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/","url":"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/","name":"Understanding the challenges of BCF in BIM management","isPartOf":{"@id":"https:\/\/www.mezzoteam.fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/#primaryimage"},"image":{"@id":"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mezzoteam.fr\/app\/uploads\/2024\/02\/SITEWEB_actu2.jpg","datePublished":"2025-01-17T08:50:00+00:00","dateModified":"2025-01-20T09:21:51+00:00","author":{"@id":"https:\/\/www.mezzoteam.fr\/#\/schema\/person\/694c66b08f103f35234bca0ff514422a"},"description":"Discover the crucial role of the BCF in improving coordination and collaboration in BIM projects, best practices and key benefits.","breadcrumb":{"@id":"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/#primaryimage","url":"https:\/\/www.mezzoteam.fr\/app\/uploads\/2024\/02\/SITEWEB_actu2.jpg","contentUrl":"https:\/\/www.mezzoteam.fr\/app\/uploads\/2024\/02\/SITEWEB_actu2.jpg","width":1262,"height":450},{"@type":"BreadcrumbList","@id":"https:\/\/www.mezzoteam.fr\/en\/understanding-the-challenges-of-bcf-in-bim-management\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mezzoteam.fr\/en\/"},{"@type":"ListItem","position":2,"name":"Understanding the challenges of BCF in BIM management"}]},{"@type":"WebSite","@id":"https:\/\/www.mezzoteam.fr\/#website","url":"https:\/\/www.mezzoteam.fr\/","name":"Mezzoteam","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mezzoteam.fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.mezzoteam.fr\/#\/schema\/person\/694c66b08f103f35234bca0ff514422a","name":"Sophie S\u00e9nant","url":"https:\/\/www.mezzoteam.fr\/en\/author\/sophie\/"}]}},"_links":{"self":[{"href":"https:\/\/www.mezzoteam.fr\/en\/wp-json\/wp\/v2\/posts\/12422"}],"collection":[{"href":"https:\/\/www.mezzoteam.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mezzoteam.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mezzoteam.fr\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mezzoteam.fr\/en\/wp-json\/wp\/v2\/comments?post=12422"}],"version-history":[{"count":19,"href":"https:\/\/www.mezzoteam.fr\/en\/wp-json\/wp\/v2\/posts\/12422\/revisions"}],"predecessor-version":[{"id":12858,"href":"https:\/\/www.mezzoteam.fr\/en\/wp-json\/wp\/v2\/posts\/12422\/revisions\/12858"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mezzoteam.fr\/en\/wp-json\/wp\/v2\/media\/11189"}],"wp:attachment":[{"href":"https:\/\/www.mezzoteam.fr\/en\/wp-json\/wp\/v2\/media?parent=12422"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mezzoteam.fr\/en\/wp-json\/wp\/v2\/categories?post=12422"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mezzoteam.fr\/en\/wp-json\/wp\/v2\/tags?post=12422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}